Sealing a protective bundKazakhstan, Atyrau region
In this project, GCCM was used to strengthen and seal a protective bund around the discharge tank of a pumping station. The work was completed within 1 day at low cost. Using CCX-M significantly shortened construction time: the installation rate reached 300 m² per 8-hour shift with a crew of 6.