Concrete Canvas® in mining projects

Concrete Canvas is an ideal solution for mining sites. Mines are often located in difficult terrain and extreme climates, with work carried out in remote, sparsely populated areas. The material is easy to use, convenient to transport to site and fast to install.

Learn more about what Concrete Canvas® can do:

Strengthening an artificial damStrengthening an artificial dam

Kazakhstan

July 2023CCX-M

To suppress surface erosion and weathering, a GCCM CCX-M lining was installed on the slope of a debris-flow protection dam over 25 metres long, next to a viewing platform. CCX-M is a more efficient alternative to sprayed concrete or other mortars applied to slopes. A crew of 4 finished the work in just one day. A total of 285 m² of Concrete Canvas was used.

Strengthening an artificial damStrengthening an artificial dam

Russia, Krasnoyarsk Krai

October 2020CCX-M

Concrete Canvas was used to create a sealed protective lining at a hydrocarbon storage base. Conventional lining methods required heavy machinery and equipment with limited site access, and took a long time. Reliable, long-term protection of the tank area was needed in the shortest possible time. GCCM fully met these requirements on schedule.

Strengthening an artificial damStrengthening an artificial dam

Kyrgyzstan, Jalal-Abad region

October 2021CCX-M

GCCM was used to strengthen an artificial tailings dam during the construction of a gold processing plant and infrastructure for developing the Tereksai gold deposit in western Kyrgyzstan.

Because of the remote location and the critical nature of the project, Concrete Canvas® was chosen as the preferred solution over conventional methods, which would not have provided the required reliability or service life.

Protecting a slope from erosion and weatheringProtecting a slope from erosion and weathering

Brazil, Pará

December 2021CCT1

Concrete Canvas was used to protect slopes at the entrance to the Pedra mine from erosion and to prevent weathering of the surrounding soil. Shotcrete and geomats for peat reinforcement were initially considered, but were rejected as too difficult to apply. Shotcrete materials were not available in the region, and installation would have disrupted mine operations.

Choosing GCCM allowed installation without stopping the mine. 5,600 m² of material was installed in 25 days.

Project on the Concrete Canvas website →