Canal liningKazakhstan, Almaty region
To reduce water losses in distribution canals, a GCCM CCX-M lining was installed at a site in the Almaty region in early July 2024. Because the site is hard to reach, delivering and placing conventional concrete would have taken a long time. To bring the distribution canal into service sooner, the district administration chose Concrete Canvas. All work, including installation and surface hydration, was completed in 4 days.



